Client: Town of Milford
Contract Value: $6,241,000
- Installed 16,000 s.f. of tied-back soldier pile and lagging
- 45,000 c.y. of structure excavation for the installation of new CIP primary and secondary settling tanks, aeration tanks, and support buildings
- Installed and maintained a dewatering system capable of removing 350 gallons per minute
- Installed over 15,000 l.f. of new plant piping while maintaining the daily operation of the plants
- Excavated and disposed of 12,000 tons of contaminate fly ash
- Installed 4,200 s.f. of permanent epoxy coated groundwater cutoff sheeting
- Completed all site finishes including building backfill, concrete sidewalks, and asphalt driveways and parking lots.