Client: Yale University
Contract Value: N/A
- Relocated 1,600 l.f. of high pressure steam and chilled water lines
- Formed and poured 675 s.f. steam vault
- Excavated, formed and poured 1,300 l.f. of electrical and telecom ductbank
- Set three precast steam, telecom, and electric vaults
- Installed 13,000 s.f. of soldier pile and lagging
- 19,250 c.y. of structure excavation
- Installed new utility infrastructure (potable water, fire service, storm and sanitary piping, and electrical and telecom duct banks)
- Connected the site to the existing utility grid while maintaining vehicle and pedestrian access through the local streets